Back to List

Lexington Parkway Reconstruction Open House

When

Date 
March 25, 2021
Time 
5-6:30 p.m.

Location

Online meeting Register via Zoom

Ages

All

Beginning of tab section with 2 tabs. Left and right arrow keys will navigate between tab navigation links.

Lexington Parkway will be extended from West 7th Street to Shepard Road in Saint Paul using the existing Elway Street. Construction is scheduled for 2022.

Attend the open house to learn more and share your feedback with the project team on your preferred layout. The draft road layouts being evaluated include options for a two-way stop, a full roundabout and a mini roundabout at the new Elway Street and Montreal Avenue intersection.

Lexington Parkway phase two project page

Nick Fischer, Project Manager
651-266-7119

Back to tab navigation. End of tab content.