Energy Park Drive Concrete Repair

Contact us

The concrete pavement on Energy Park Drive from Everett Court to 660 feet east of Everett Court was repaired. Work included concrete joint replacement, surface repairs and catch basin repairs.

View project on interactive map

Subscribe to road project updates

Timeline

Work is complete. Stripes have been added to the road.

Detours

The road is fully reopen to traffic.

Road layout change

As part of this project and the adjacent resurfacing of Energy Park Drive, the road will be converted from four traffic lanes to three and bike lanes will be added. The layout will include one vehicle traffic lane in each direction, a center left-turn lane and one bike lane in each direction.