Riverview Corridor Project Library

Scroll table right to see more

A great deal of information about the modern streetcar and arterial bus concepts was presented to the Riverview Policy Advisory Committee at their meetings on Jan. 31 and Feb. 29, 2024. The committee voted to release the transit concepts for public review and comment. The full presentations are also available for review in the Policy Advisory Committee section of the archive.

Comparison of Options

Information

Materials
The modern streetcar and arterial bus concepts can be compared, but are very different in scope and impact. Comparison of Options
The economic development analysis provides a projection of the increase in real estate value appreciation and new development generated by new transit investment. Economic Development Analysis
Scroll table right to see more

Modern Streetcar Animations

Information Link
Station at West 7th St. and Davern St. Link
Station at West 7th St. and Toronto St. Link
Station at West 7th St. and Jefferson Av. Link
Station at West 7th St. and Webster St. Link
Station at West 7th St. and Walnut St. Link
Station at Kellogg Blvd. and Minnesota St. Link

 

Scroll table right to see more

Modern Streetcar

Information

Materials
Modern Streetcar route map: Union Depot to Mall of America Map
Downtown Saint Paul (Options 1 and 2) Map
West 7th Street Dedicated Use (Option 1) Images
West 7th Street Shared Use (Option 2) Images
West 7th Street Comparison Maps
Bloomington: Bdote - Ft. Snelling Maps and Images
Bloomington: Mall of America Maps and Images

 

Arterial Bus

Information

Materials
Arterial Bus Route Map: Union Depot to Mall of America Map
Comparison to Route 54 Table
Downtown Saint Paul Map
West 7th Street Stations Images
Bloomington Area Maps

Community engagement handout

We distribute a handout with a map at events which provides information about the project details, overall goals and its benefits to the community.

Project Documents (EPE Phase)

The Engineering and Pre-Environmental phase of the Riverview Corridor project began in October 2020. Project documents are available in PDF format.

Pre-Project Development (2014-2017) final study documents

Final documents are available in PDF. Print copies may be requested by completing the feedback form.