Energy Park Drive Resurfacing Layout

As part of the resurfacing of Energy Park Drive between Everett Court and Lexington Avenue in 2020, several changes will be made to the road layout.

Everett Court to Snelling Avenue

Graphic showing existing layout on Energy Park Drive from Snelling to Lexington with four drive lanes
Existing layout: Everett Court to Snelling Avenue (Layout made with Streetmix / CC BY-SA)
Graphic showing proposed layout on Energy Park Drive from Raymond to Snelling with two drive lanes, center turn lane and two bike lanes
Proposed layout: Everett Court to Snelling Avenue (Layout made with Streetmix / CC BY-SA)

Snelling Avenue to Lexington Avenue

Graphic showing existing layout on Energy Park Drive from Snelling to Lexington with four drive lanes
Existing layout: Snelling Avenue to Lexington Avenue (Layout made with Streetmix / CC BY-SA)
Graphic showing proposed layout on Energy Park Drive from Snelling to Lexington with two drive lanes and two bike lanes
Proposed layout: Snelling Avenue to Lexington Avenue (Layout made with Streetmix / CC BY-SA)