Lexington Avenue Reconstruction Layout

The design team has identified a road layout (preferred alternative) for Lexington Avenue with:

  • An 8-foot sidewalk on the southbound side and a wider 10-foot trail on the northbound side.
  • Two through lanes in each direction.
  • A center median.
  • Dedicated left and right turn lanes throughout the project area.

View detailed road design as of December 2020

Graphic showing existing layout on Lexington Avenue with sidewalk, two thru-lanes in each direction and a two-way center left turn lane
Existing section of Lexington Avenue
Graphic showing proposed thru lane section of Lexington Avenue with sidewalk, two thru lanes in each direction and a center median
Proposed through lane section of Lexington Avenue
Graphic showing proposed turn lane section on Lexington Avenue with sidewalk, two southbound thru lanes, a center median, one northbound left-turn lane, two northbound thru lanes and one northbound right-turn lane
Proposed turn lane section of Lexington Avenue